Teatro de El Escorial, Madrid (Spain)
Architect
Juan Blasco Martínez
Consultant
Stolle, S.L.
Owner
Comunidad de Madrid
Awarded
UTE Waagner Biró-Chemtrol División Teatros, S.A.
Contact
Cayetano Astiaso
Tlf. +34 915 596 166
Budget
12 millions of euros
SCOPE
Engineering, manufacturing, installation and commissioning of the global stage equipment contract for two halls and the rehearsal hall, including:
– Technical stage floor
· Fire Safety Curtain
· Motorised Flying Bars. Variable Speed
· Hoist Control System
· Chain/Cable Point Hoist
· Acoustic Shell
· Cable Reelers
· Orchestra Lifts
– Production Lighting:
· Lighting control console
· Dimmer channels
· DMX-Ethernet patch
– Electrical Works:
· Main Protection Boxes
· Power & data cable
· Production lighting Boxes
· Work Lighting System