Teatro de El Escorial, Madrid (Spain)

  • teatro-escorial-01

Architect
Juan Blasco Martínez

Consultant
Stolle, S.L.

Owner
Comunidad de Madrid

Awarded
UTE Waagner Biró-Chemtrol División Teatros, S.A.

Contact
Cayetano Astiaso
Tlf. +34 915 596 166

Budget
12 millions of euros

Download Data Sheet

SCOPE
Engineering, manufacturing, installation and commissioning of the global stage equipment contract for two halls and the rehearsal hall, including:

- Technical stage floor

· Fire Safety Curtain
· Motorised Flying Bars. Variable Speed
· Hoist Control System
· Chain/Cable Point Hoist
· Acoustic Shell
· Cable Reelers
· Orchestra Lifts

- Production Lighting:

· Lighting control console
· Dimmer channels
· DMX-Ethernet patch

- Electrical Works:

· Main Protection Boxes
· Power & data cable
· Production lighting Boxes
· Work Lighting System

YES

2
 
140
3
58
2
16
3
 
 
3
1000
3
 
 
YES
YES
YES
YES

Uso de cookies

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información. ACEPTAR

Aviso de cookies