National Army Conference Centre Building

National Army Conference Centre Building

Architect
Designers Consultant & Associates

Consultant
Chemtrol

Owner
National Army

Awarded
Egyptian Engineering Projects Co.

Contact
D. Adel Attia
Tlf. +202-24012638

Budget
1.700.000 euros

 

Download Data Sheet

SCOPE

Engineering, manufacturing, supervision and commissioning of the upper and understage machinery system for the Main Auditorium, including:

– Stage demountable structure.
– Stage wooden flooring.
– 10 Hemp sets.
– 5 Fixed speed fly bars for proscenium.
– 2 Variable speed motorized tracks for main curtain and secondary traveller.
– 2 Manual tracks for portal legs.
– 1 Fixed speed fly bar for secondary traveller.
– 29 Variable speed fly bars for general purpose (9.5kN up to 0.9m/s).
– 2 Fixed speed lateral fly bars.
– 10 Fixed speed fly bars for stage lighting.
– 8 Variable speed, portable point hoists (2.5kN up to 1.2m/s).
– 1 Rigging computer control system including main console i-Control GX1, secondary desk i-Control Px1m, 24-outlet point hoist network, E-stop system and connection stations.
– 1 Orchestra lift (70 m²).
– 2 Portable effects stage lifts (1.1×1.1m).
– 1 Portable effects stage lift (2.3×2.3m).

Leave a reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Uso de cookies

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información. ACEPTAR

Aviso de cookies