Complejo Cultural, Vic (Spain)

  • motores-vic
  • sala-vic
  • sala-vic2

Architect
Josep Llinàs

Consultant
Otto Projectes, S.L.

 Owner
Excmo. Ayto. de Vic

Customer
FCC, S.A.

Contact
Tom Seix
Tlf. +34 934 14 19 70

Budget
3,6 millions of euros

Download Data Sheet

SCOPE
Engineering, manufacturing, installation and commissioning of the stage and audiovisual equipment for the theatre hall and the auditorium, including:

Theatre

Auxiliary structures for grid, galleries, stage floor, bridges, etc.  Stage wooden flooring.  Safety curtain and manual system for conformation of proscenium.  29 variable speed battens, 10 fixed-speed point hoists, proscenium motorized batten, computerized motor control system, counterweighted batten for main curtain and 10 hemp sets.  Curtains and textiles.  Stage lighting system composed of control (2 desks of 1024 channels each), dimming (384 circuits), distribution, fixtures and accessories. Sound, intercom, paging and audiovisuals.  Electrical infrastructures for the above.  House lighting control and dimming.

Auditorium

Three motorized platforms for configuration of stage.  Set of ceiling fixed bars for suspension of elements and equipment. Stage lighting system composed of control (1 desk of 1024 channels), dimming (48 circuits), distribution, fixtures and accessories. Sound, intercom, paging and audiovisuals.  Electrical infrastructures for the above.  House lighting control and dimming.

Uso de cookies

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información. ACEPTAR

Aviso de cookies